Welcome to ExamTopics
ExamTopics Logo
- Expert Verified, Online, Free.

Unlimited Access

Get Unlimited Contributor Access to the all ExamTopics Exams!
Take advantage of PDF Files for 1000+ Exams along with community discussions and pass IT Certification Exams Easily.

Exam N10-008 topic 1 question 741 discussion

Actual exam question from CompTIA's N10-008
Question #: 741
Topic #: 1
[All N10-008 Questions]

A company is upgrading the network switches at its backup data center, which is geographically separated from the main data center. The company hired a contractor to physically install and cable the new switches in their cabinets. Which of the following should the network engineering team provide to ensure the job is completed accurately?

  • A. Rack diagram
  • B. IDF diagram
  • C. Site survey
  • D. Logical diagram
Show Suggested Answer Hide Answer
Suggested Answer: A 🗳️

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
JB1705
12 hours, 46 minutes ago
Selected Answer: A
Key word is physically install. "The company hired a contractor to physically install and cable the new switches in their cabinets"
upvoted 1 times
...
Zach123654
3 weeks, 4 days ago
Selected Answer: A
GPTTT!
upvoted 1 times
...
Community vote distribution
A (35%)
C (25%)
B (20%)
Other
Most Voted
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

SaveCancel
Loading ...
ex Want to SAVE BIG on Certification Exam Prep?
close
ex Unlock All Exams with ExamTopics Pro 75% Off
  • arrow Choose From 1000+ Exams
  • arrow Access to 10 Exams per Month
  • arrow PDF Format Available
  • arrow Inline Discussions
  • arrow No Captcha/Robot Checks
Limited Time Offer
Ends in