Which of the following checks to see if the assessable record exists for the demand and creates an assessable record if none exists?
Correct Answer:
D
🗳️
Projects and which other artifact can be linked to either a program, a portfolio, both, or neither.
Correct Answer:
A
🗳️
If Scenario Planning for PPM is installed, a portfolio manager can access the Portfolio Planning Workbench by navigating to which of the following? (Choose two.)
Correct Answer:
CD
🗳️
When creating a resource plan within a demand, how are the default dates on a resource plan determined?
Correct Answer:
A
🗳️