DRAG DROP -
A company has several applications that are being moved to a Horizon environment. An architect has been given several application types and is designing an environment to accommodate all of the applications.
List of applications:
✑ WebSeller "" a cloud-based application that is single sign-on capable.
✑ RoloContact "" a Windows application that utilizes an Internet Explorer 6 and an IE plugin, but needs to be deployed to Windows 8 desktops.
✑ AppOffice "" a group of Windows based application that needs to be deployed together to an existing View linked clone desktop pool for the remote sales team.
✑ RelationCRM "" a server-based application that is currently accessed via RDP.
Match each application with its appropriate deployment method.
Select and Place:
Correct Answer:
DRAG DROP -
A customer has an aging storage array that must be replaced. The array is used by VMware hosts in their data center. The storage array is under warranty, but the hosts are all out of warranty. The customer wants new hardware running Horizon 7, and is open to a hyperconverged solution. The project must take place with minimal-to-no disruption during normal business hours. The CIO states there is a maximum budget of $600, 000 for the project. The IT Director says their
UPS units were replaced last year and they don't need to be updated. The existing racks are heavily populated, with limited rack units remaining and no additional datacenter floorspace for another rack.
Match the statements taken from the scenario with its correct design category.
Select and Place:
Correct Answer:
The IT team for a small government organization wants to deploy Horizon Apps.
✑ It needs to provide Windows desktops to two groups of users.
✑ Most users only need a few Windows applications.
✑ It wants to minimize storage space required.
✑ It determined that they need 4 RDS Hosts, but more will be needed in the next 6 to 8 weeks.
✑ It installed and configured RDS on a Windows server VM, installed the Horizon Agent, and then the Windows applications.
What steps must the organization perform next to create a scalable and flexible Horizon Apps deployment?
Correct Answer:
B
🗳️
A security team is implementing VMware Identity Manager to have a central point for authentication to facilitate access to its company's applications. The team would like to have users to authenticate to VMware Identity Manager before being able to connect to a Horizon View Desktop.
What can be done to ensure that users who try to authenticate to the Horizon View Connection brokers are forced to first authenticate to VMware Identity
Manager?
Correct Answer:
D
🗳️