Company XYZ is planning to deploy primary and secondary (disaster recovery) data center sites. Each of these sites will have redundant SAN fabrics and data protection is expected between the data center sites. The sites are 100 miles (160 km) apart and target RPO/RTO are 3 hrs and 24 hrs, respectively. Which two considerations must Company XYZ bear in mind when deploying replication in their scenario? (Choose two.)
Correct Answer:
BD
🗳️
An architect receives a business requirement from a CTO that states the RTO and RPO for a new system should be as close as possible to zero. Which replication method and data center technology should be used?
Correct Answer:
A
🗳️
What are two primary design constraints when a robust infrastructure solution is created? (Choose two.)
Correct Answer:
CE
🗳️
Which network management framework can be used to develop a network architecture that contains business requirements analysis, gap analysis, and network diagrams as artifacts to be used for design and implementation later?
Correct Answer:
C
🗳️
Which two types of planning approaches are used to develop business-driven network designs and to facilitate the design decisions? (Choose two.)
Correct Answer:
AC
🗳️
Reference:
https://community.cisco.com/legacyfs/online/ccde_9781587144615_chapter1.pdf page 18